一路 BBS

 找回密码
 注册
搜索
查看: 1397|回复: 0
打印 上一主题 下一主题

资金短缺导致中国铁路建设大面积停工

[复制链接]
跳转到指定楼层
楼主
发表于 10-20-2011 12:56:27 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
(1) Norihiko Shirouzu, Funding Shortages Halt China Rail Projects. Wall street Journal, Oct 20, 2011
http://online.wsj.com/article/SB ... 40663584454934.html

, which is translated into Chinese:
资金短缺导致中国铁路建设大面积停工. WSJ, Oct 20, 2011
http://cn.wsj.com/gb/20111020/bch085426.asp
(铁路承建商中国中铁隧道集团(China Railway Tunnel Group)的副总工程师王梦恕)

(2) 中国高铁闹钱荒遭遇缓建. VOA Chinese, Oct 19, 2011.
http://www.voanews.com/chinese/n ... cash-132176328.html

My comment:
(a) Reading any of the three reports is enough.
(b) WSJ cites
Xin Dingding, Lack of Cash Brings Rail Projects to a Standstill. China Daily, Oct 19, 2011
http://www.chinadaily.com.cn/cndy/2011-10/19/content_13929277.htm
(citing Wang Mengshu, deputy chief engineer at China Railway Tunnel Group)
(c) China Daily had this English-language report in recent days--no Chinese one. However, it did re-published a Chinese report.

铁路建设资金告急项目全线缓建. 新浪, Sept 30, 2011.
http://www.chinadaily.com.cn/hqc ... ontent_3949782.html

See also:
我国铁路投资遭严格控制高铁地铁建设终止大跃进. 今日早报 (浙江日报报业集团), Oct 2, 2011
http://news.xinhuanet.com/fortune/2011-10/02/c_122115720.htm

(d) Regarding the above VOA report.

For 伊利诺伊大学香槟分校铁路运输和工程中心的高聪忠教授, see
Railroad Engineering Center Established. Civil and Environmental Engineering, University of Illinois at Urbana-Champaign, May 6, 2010
http://cee.illinois.edu/railtec
(Rail Transportation and Engineering Center (RailTEC); Professor Tsung-Chung (TC) Kao of National Taiwan University, retired Vice President of Engineering for the Taiwanese High-Speed Rail Corporation, and a visiting scholar)
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

快速回复 返回顶部 返回列表